New Project Upload a drawing to begin
>

Project overview

Permit-approved set → quantities and units by trade, measured from your drawings. Code review lives in its own tab. Costs are estimates from your unit prices.

Concrete
slabs · footings · walls
Steel + rebar
beams + reinforcing
Soil to remove
loose yd³ · the quoted qty
Openings
windows · ext/int doors

Trades & categories — quantities first

ESTIMATED MATERIAL COST — AVERAGE OF PRICED LINES
$0

Upload a floorplan

Choose a PDF. The app opens it, shows the sheets, reads any dimensions it can, and builds the takeoff. Scanned image PDFs can be viewed but not auto-measured yet — you enter the key dimensions and it calculates the rest.

Upload each discipline — drag a PDF onto its slot (or tap to browse). They all merge into one project; big files compress automatically.
Civil / Site — not a schedule count; site servicing is measured off the plans.

Drawings

The sheets Give Me The Cost read from the uploaded set. Click a sheet to view it. On the floor plan, coloured pins show exactly where code issues were found.

drawing sheet
Your uploaded sheets appear on the Upload page. Full in-app sheet viewer is coming with saved projects.

Material takeoff

The app calculates the quantities from your drawing dimensions. You enter the unit cost for each material — the total = quantity × your price. Costs start blank on purpose.

Project inputs

read from your drawings — edit any value
▸ Standard assumptions the app falls back on (only when a value isn't on the drawing)
  • Slab thickness: suspended 8", basement 4", garage 4" (OBC 9.16 min 3–4")
  • Strip footing: 16"×8" (OBC 9.15 min width 250 mm / 10", min thickness 100 mm / 4")
  • Foundation wall: 8" / 6" ICF core, 8' height
  • Spacing: wall studs & floor joists 16" o.c.; roof trusses 24" o.c.
  • Waste factor: +10% on framing, sheathing & drywall
  • Drywall: ½" walls / ⅝" ceilings, 32 ft² per 4×8 sheet
Tags: drawing read/measured off the plans · std standard assumption · count you enter from schedules.
Concrete discounts:
ItemSpec / noteQuantityUnit costEst. costSource
Estimated total  $0
Pricing: concrete uses a supplier price list (cost per m³ by mix class) with standard estimating adjustments applied. Mapping: footings/walls/basement → 20 MPa no-air $133 · suspended slab → 30 MPa no-air $148 · garage → 35 MPa C-1 air $171 (nearest to the 32 spec). Rebar: 15M $1,800/t · 20M $2,100 · 25M $3,000 · 30M $3,000. Other materials carry RETAIL SEED prices (homedepot.ca / rona.ca — Lowe's Canada is now RONA) — verify or overwrite with your supplier rates. Excavation is left unpriced: subs quote per loose yd³ + machine day rates. Change ceiling height 9–25 ft to update stud lengths & counts.
▸ Concrete supplier price list (per m³, supply)
  • 20 MPa NO AIR (20N200) — $133   |   25 MPa (25N200) — $138   |   30 MPa (30N200) — $148
  • 35 MPa NO AIR (35N200) — $158   |   40 MPa (40N200) — $169   |   50 MPa (50N200) — $190
  • 25 MPa F-2 4–7% air (25F200) — $148   |   30 MPa F-2 (30F200) — $158
  • 35 MPa C-1 5–8% air (35X200) — $171   |   40 MPa C-1 (40X200) — $185   |   50 MPa C-1 (50X200) — $198
Supplier notes: Polar Mix discount −$8/m³; 2% off for 30-day prompt payment (not auto-applied — subtract from cost if it applies).
This is a large (Part 3) building. The checks on this tab are Ontario Part 9 HOUSE rules — they don't apply here, so they're hidden. Part 3 buildings are reviewed under Division B Part 3 by the design team and municipal examiner; a large-building code module is on the roadmap.

Ontario Building Code review

A real Part 9 check. Enter the value from the drawing for each item — it’s compared live against the actual OBC requirement. Blank = not checked yet.

14 real OBC Part 9 checks — egress 9.9.10, stairs 9.8.2/9.8.4, handrail 9.8.7, guards & window fall protection 9.8.8, ceiling 9.5.3, hallway 9.5.7, door 9.5.5, smoke/CO 9.10.19, safety glazing 9.7.2. Enter the value from the drawing; it checks live against the real threshold. Auto-reading these off a drawing is the Claude-vision step. Approval likelihood is capped at 99% \u2014 this tool can’t issue formal approvals; the final 1% and the official decision rest with your municipal plan examiner.

Summary report

Generated live from this project's takeoff — measurements first, priced lines second. Print or save as PDF from your browser.

My projects

Every takeoff saved to your account. Open one to keep working — quantities, your rates, and the revision history come back exactly as you left them.

Loading your projects…

Read confidence BETA

How much of each trade is measured off the drawings vs carried as an assumption — and the one thing that would raise it. Nothing reads 100%: this is a permit-stage read; final quantities firm up on the tender set. Visible to your account only.

Open a project with a takeoff to see its confidence.
S